Volume · Weight · Bags · Delivered Cost

Dirt Calculator

Enter your area dimensions, pick a material, and get an instant cubic-yard count with tons, truckloads, bag equivalents, and a delivered-cost estimate. Supports rectangles, slopes, circles, triangles, rings, and road sections — across multiple areas at once. Use it as a fill dirt calculator for grade-up and backfill, or as a topsoil calculator for the finishing layer.

✓ Free, no sign-up⬒ 6 shape modes⚖ Imperial & metric⌂ Multi-area totals

Input Parameters

Quick presets

Area 1· Rectangle / Flat Area

✓ 20' 0" (240 in)

✓ 15' 0" (180 in)

✓ 0' 6" (6 in)

Material & Compaction

Cheapest bulk fill; may contain small rocks or clods

+15%
0%+15%30%

Loose dirt shrinks when spread and tamped — 15% is the recommended residential default.

Delivery & Bagging

Most residential deliveries

Standard big-box bag volumes — bag equivalents appear in results.

Cost & Deliveryoptional

$

Fill Dirt — Mixed / Unscreened: typically $5–$15/yd material only.

Unlocks a regional freight estimate for your area.

Flat fee for each truck — how most bulk yards quote

Your Estimate

Cubic yards to order

6.4

cu yd · includes +15% buffer · density 1.55 t/yd³

Base volume

5.56 yd³

150 ft³ before buffer

Weight

9.90 t

short tons · 1.55 t/yd³

Truckloads

1 × 10 yd³

Standard single-axle

Bag equivalent

173 bags

1.0 cu ft bag

Cubic feet

173 ft³

150 ft³ base · +15% buffer

Gallons

1,290 gal

planters & amendments

Budget estimate

Material (6.4 yd³ × $18)$115

Planning estimate only — confirm pricing with local suppliers.

Formula: L × W × D ÷ 27 = base cu yd. Buffer added on top. Weight uses product-specific density (115 lb/ft³). Circle/ring/road modes apply πr², π(R²−r²), and trapezoid cross-sections respectively.

Quick answer

How Much Dirt Do You Need?

Multiply length × width × depth (all in feet), then divide by 27 to get cubic yards. Always add a compaction buffer — 15% is the reliable default for residential work. A 20 × 15 ft area at 6 inches deep needs 20 × 15 × 0.5 ÷ 27 = 5.56 cu yd base, or 6.4 cu yd to order with the buffer. One cubic yard of mixed fill dirt weighs about 1.55 tons and covers 54 sq ft at 6 inches deep.

Step by step

How to Use This Dirt Calculator App

Five inputs drive every number in the results panel. Work through them in order and the figure you hand to a supplier already accounts for the two things most homeowners forget: compaction loss and the unit the yard actually bills in.

  1. 1

    Measure each area separately

    Take length and width in feet for every zone — front yard, side beds, driveway apron. Split L-shaped or odd lots into rectangles, circles, and triangles and add them as separate areas; the calculator totals them. Measure twice and round up slightly, because a 6-inch error across a 40 ft run changes the order by half a yard.

  2. 2

    Set the finished depth, not the loose depth

    Enter the depth you want after the dirt is spread and settled. On uneven ground use the average depth across the area. Typical residential values: 3–6 in for yard leveling, 6–12 in for foundation grade-up, 4–8 in for a garden-bed base, and 6–12 in for driveway subbase.

  3. 3

    Pick the material you will actually receive

    Fill dirt, screened fill, sandy fill, clay, and topsoil each carry their own density from about 1.0 to 1.72 tons per cubic yard. Selecting the right one fixes the tonnage line, the price range, and the compaction default in one step.

  4. 4

    Choose a compaction buffer

    Loose delivered dirt shrinks once it is spread and tamped, so the order has to exceed the measured hole. Use 10% for granular sand, 15% for general residential grading, and 20–25% for clay-heavy or structural fill placed to a compacted specification.

  5. 5

    Read the order figure, then add logistics

    The “order” number already includes the buffer — that is what you give the supplier. Truckloads round up because yards do not deliver fractional loads, and freight is quoted per load, per cubic yard, or per ton depending on the yard. Enter your ZIP and price to see a delivered range.

Ask for “clean fill” by name. It means no construction debris, trash, concrete chunks, stumps, or large roots — anything that will rot and leave a void later. Small rocks and clods are still normal in unscreened fill, which is why the surface layer is usually finished with screened material or topsoil.

The math

Dirt Volume Formula (How the Calculator Works)

Every dirt estimate starts as a volume problem: geometry first, conversions second. The number 27 converts cubic feet to cubic yards — one cubic yard is 3 ft × 3 ft × 3 ft = 27 cu ft. Depth measured in inches must be divided by 12 before multiplying.

Volume (cu yd) = L (ft) × W (ft) × D (ft) ÷ 27

Order = Base × (1 + buffer %) · Tons = cu yd × material density

Worked Example: 10 ft × 10 ft at 6 Inches

  1. Step 1. Convert depth: 6 in ÷ 12 = 0.5 ft
  2. Step 2. Volume: 10 × 10 × 0.5 = 50 cu ft
  3. Step 3. Convert: 50 ÷ 27 = 1.85 cu yd base
  4. Step 4. Add 15% buffer: 1.85 × 1.15 = 2.13 cu yd to order
  5. Step 5. Weight (mixed fill): 2.13 × 1.55 = 3.3 tons — one pickup load is ~1.25 tons, so plan a bulk delivery.

Dirt Calculator with Compaction: Why Add a Buffer?

Loose fill dirt shrinks when it is spread and tamped. A truck delivers cubic yards of fluffed material; once a plate compactor passes over it, the same dirt occupies a smaller volume. Order only the base calculation and your fill will finish below grade. Granular sandy fill compacts roughly 10–12%, general residential fill about 15%, and clay-heavy fill can shrink 20–25% from its loose delivered volume.

Volume states

Bank, Loose & Compacted: Why 10 Yards Isn't Always 10 Yards

Dirt changes volume three times between the ground and the finished grade. Suppliers quote in different states, so mixing them up is the most common reason a job comes up short. Here is what each one means.

StateWhat it meansVolume change
Bank (Bcy)Dirt sitting naturally in the ground before anyone digs it. Survey volumes and cut-and-fill takeoffs are measured in bank yards.1.00 — baseline
Loose (Lcy)The same dirt after excavation and loading. Air gets trapped between clods, so it fluffs up. This is the state it arrives in on a dump truck.≈ +10–25% swell
Compacted (Ccy)Dirt after spreading, watering, and tamping in lifts. Air is forced out and the material densifies. This is the depth you actually keep.≈ −20% shrink from loose

The 20% rule of thumb

If the fill will be compacted with a plate or roller — and structural fill should be — order 20–25% more loose dirt than the measured hole. Leftover dirt is cheap; a second delivery to fetch the last yard and a half is not. For non-structural garden and landscape fill, 10–15% is usually enough.

Swell factor varies by soil

Granular sand and gravel swell about 10–15%; loam and mixed fill 15–25%; heavy clay can swell 25–35% because it breaks into large, airy clods. Shrink on compaction runs in the opposite direction — sandy material consolidates least, clay the most. That is why the buffer is adjustable instead of fixed.

Planning shortcut: measured hole (compacted) × 1.25 ≈ loose yards to order for structural fill; × 1.10–1.15 for landscape fill. Then convert loose yards to tons with the material density — never convert compacted volume directly to tons.

Geometry

Six Shape Modes, One Calculator

Real projects are rarely one clean rectangle. Pick the shape that matches each zone — or add several areas and let the calculator total them.

Rectangle / Flat Area

L × W × D ÷ 27

A 40 × 20 ft backyard filled 6 in deep: 40 × 20 × 0.5 ÷ 27 = 14.8 cu yd base.

Best for: Yard leveling, garden beds, foundation grade-up, pads

Slope / Wedge

(L × W × D) ÷ 2 ÷ 27

A 40 × 20 ft slope 18 in deep at the low end: (40 × 20 × 1.5) ÷ 2 ÷ 27 = 22.2 cu yd.

Best for: One edge at grade, tapering to a maximum depth at the far edge

Circle

π × (d ÷ 2)² × D ÷ 27

A 12 ft diameter round bed 4 in deep: π × 36 × 0.333 ÷ 27 = 1.4 cu yd.

Best for: Round beds, tree rings, fire-pit pads, post and pole holes

Triangle

(b × h ÷ 2) × D ÷ 27

A corner bed with 15 ft base, 10 ft height, 6 in deep: 37.5 cu ft = 1.4 cu yd.

Best for: Lot corners and odd-angled beds rectangles can't model

Ring / Donut

π × (R² − r²) × D ÷ 27

A ring bed 10 ft outside ⌀ with a 4 ft tree circle, 8 in deep: 4.9 cu yd.

Best for: Donut beds around trees, pools, and patio islands

Road / Trench Section

((Wt + Wb) ÷ 2) × D × L ÷ 27

A 200 ft lane, 12 ft top / 10 ft base, 4 in avg: 200 × 11 × 0.333 ÷ 27 = 27.1 cu yd.

Best for: Driveway subbase, private lanes, and ditch regrade sections

Fill Dirt Calculator on Slope Ground

On sloped ground the fill tapers from zero at the high edge to full depth at the low edge, so a flat L × W × D reading over-orders by nearly half. Select the Slope shape and enter the maximum depth at the low side — this fill dirt calculator on slope ground applies the average-depth method, (L × W × D) ÷ 2 ÷ 27, so a 40 × 20 ft yard tapering to 18 in at the low end needs 22.2 cu yd, not the 44.4 cu yd a flat reading suggests. Ground that falls in two directions should be split into two slope areas and totaled.

Density reference

Dirt Calculator Weight & Tons by Material

One cubic yard of dirt weighs roughly 1.35 to 1.82 short tons depending on classification. Avoid flat conversion factors — a supplier quoting "1.4 tons per yard" can be off by 25% at either end of the range. The calculator locks each product to its own density; wet material runs 5–15% heavier than these dry-basis figures.

MaterialTons / cu ydlb / cu ftTypical $ / ydBest for
Fill Dirt — Mixed / Unscreened1.55115$5–$15Cheapest bulk fill; may contain small rocks or clods
Fill Dirt — Screened1.50111$12–$25Rocks & roots removed; smoother final grade
Sandy Fill / Granular1.45107$15–$30Best drainage; common under slabs and pavers
Sandy Loam Fill1.62120$15–$25General-purpose fill; moderate compaction
Silty Fill1.55115$10–$20Moisture-sensitive; verify drainage before use
Clay-Heavy Fill1.72127$10–$20Compacts hard; shrinks 20–25% from loose volume
Structural / Engineered Fill1.65122$15–$35Spec graded material for load-bearing placement
Topsoil — Unscreened1.35100$10–$20Planting layer; never use as structural fill
Topsoil — Screened1.3096$20–$40Premium lawn & bed layer; rocks and clods removed
Compost / Garden Mix1.0074$25–$50Light organic blend for beds — not for grade-up
Fill Sand1.35100$15–$35Drainage layers, pipe bedding, under-slab base

Fill Dirt vs. Topsoil

Fill dirt is subsoil with minimal organic matter — it compacts to a stable, load-bearing surface for grade-up and backfill. Topsoil is the nutrient-rich upper layer (2–10% organic matter) for planting. They are not interchangeable: fill dirt will not grow plants, and topsoil decomposes and settles under structural loads. Many projects layer both — fill to build grade, then 4–6 inches of topsoil on top.

Bags vs. Bulk

A cubic yard equals 36 bags of 0.75 cu ft or 27 bags of 1 cu ft. Bagged material runs 5–10× the per-yard price of bulk, so bags make sense up to about 1–2 cubic yards; past that, a single bulk delivery almost always wins on price and effort. The bag equivalent in the results panel uses your selected retail bag size.

Buying guide

Screened, Unscreened, Clean & Structural Fill

Every supplier asks the same question first: screened or unscreened? The answer decides how the material handles, what it costs, and which layer of the job it belongs in. Grades below are the ones you will actually be quoted in the US.

GradeWhat it isTypical $ / ydWhere it belongs
Unscreened / clean fillStraight from a dig site, no processing. May contain small rocks, clods, and roots.$5–$15Bottom 80% of a deep lift, rough grade, bulk volume nobody will plant in
Screened fillRun through a 1/2–3/4 inch mesh; rocks and roots removed, uniform texture.$12–$25Top 6 inches, under sod, final grade, anywhere that has to rake cleanly
Structural / select fillSpec-graded material placed and tested to a target density, often 95% Standard Proctor.$15–$35Under slabs, behind retaining walls, engineered pads, road base
Sandy fill / granularFree-draining granular soil with minimal fines and almost no organic matter.$15–$30Under pavers and slabs, wet or poorly drained sites, pipe bedding
Clay-heavy fillHigh-plasticity subsoil that compacts hard and holds water.$10–$20Pond liners, water-retention berms — not beneath structures or planting
Screened topsoilNutrient-rich upper layer with 2–10% organic matter, screened for planting.$20–$40Lawns, garden beds, planting pockets — always the top layer, never structural
Compost / garden mixBlended organic amendment, light and nutrient-dense, decomposes over time.$25–$50Bed preparation and soil improvement, not grade-up or fill

Screened vs. unscreened

  • Unscreened runs about half the price per yard and is fine as bulk volume — just expect rocks, roots, and clods in the pile.
  • Screened costs more but spreads, rakes, and grades without picking. It is the right call for the visible top layer.
  • Layering both — unscreened below, screened on top — is how most crews get a clean finish without paying screened prices for the full depth.

What “clean fill” actually means

Clean fill refers to what is not in the dirt: no construction debris, trash, concrete chunks, glass, metal, stumps, or large roots. It says nothing about screening — clean fill can still contain small rocks and clods. Ask for a sample or the pit source before accepting a load, because organic debris rots and leaves voids that show up as sinkholes a year later.

Price per truckload: multiply the per-yard price by the load size to compare yards fairly. At $12/yd, a 14 yd³ tandem load is about $168 of material; at $25/yd it is $350. Freight of $50–$150 per load is billed on top either way, so two half loads almost always cost more than one full load.

Coverage & depth

How Far Does a Cubic Yard Go?

One cubic yard covers 324 square feet at 1 inch deep. Divide 324 by your depth in inches for any other depth — the chart below covers the common ones.

DepthCoverage per cu ydYards per 1,000 sq ft
1"324 sq ft3.1 yd³
2"162 sq ft6.2 yd³
3"108 sq ft9.3 yd³
4"81 sq ft12.3 yd³
6"54 sq ft18.5 yd³
8"40.5 sq ft24.7 yd³
12"27 sq ft37.0 yd³
Project typeTypical depthCompaction?
Yard leveling3–6"Light tamp OK
Foundation grade-up6–12"Yes — 4 in lifts
Garden bed base4–8"No — topsoil on top
Raised beds (filled)8–12"No
Driveway subbase6–12"Yes — multiple lifts
Under concrete slab4–6"Yes — well compacted
Trench backfillFull depthYes — 8 in lifts
Retaining wall backfillVariesYes — spec density

Foundation grading tip: build positive drainage away from the building — slope at least 6 inches over the first 10 feet from the foundation wall. Compact fill in 4-inch lifts, and avoid placing expansive clay directly against masonry. For significant low spots, add fill in lifts and compact each layer rather than dumping the full depth at once.

Depth reference

How Deep Should Fill or Topsoil Be?

Depth moves the order far more than area does — doubling the depth doubles the yardage. These are the finished depths contractors typically specify, measured after spreading and settling.

ApplicationTypical finished depthNotes
Overseeding / grass-seed topdressing1/4 – 1/2"Just enough to cover seed and hold moisture
Topdressing an established lawn1/2"Deeper smothers the existing turf — split into two passes
Regrading / settling repair2 – 4"Feather edges so water still drains away from the house
Sod bed preparation3 – 4"Firm, level, and free of rocks before rolls go down
New lawn over prepared subgrade4 – 6"Root zone depth for a durable lawn
Flower bed / shrub bed6 – 8"Annuals shallower, perennials and shrubs toward the deep end
Vegetable / raised garden bed10 – 12"Root crops need the full 12 in; 18 in for deep raised beds
Foundation grade-up6 – 12"Place in 4 in lifts, compacted, with positive drainage away
Driveway subbase6 – 12"Multiple compacted lifts; deeper for heavier vehicle loads
Under a concrete slab4 – 6"Well compacted and uniform — never on soft or organic soil

Topsoil

6–12 in for gardens and lawns

Root depth decides the number. Root vegetables want 12 in or more.

Fill dirt

As deep as the grade requires

Build in 4–6 in lifts rather than dumping the full depth at once.

Compost

2–4 in, mixed in

Blend into the top 6–8 in instead of layering, to avoid a perched water table.

Uneven ground: measure the deepest point and the shallowest point in each area, average them, and enter that figure. For a yard that slopes from 2 in at the high side to 10 in at the low side, plan on 6 in — the calculator's slope mode handles a straight wedge with the same math automatically.

Conversions

Dirt Calculator Tons, Cubic Yards & Acres

Three constants do all the work: 27 cubic feet in a cubic yard, 43,560 square feet in an acre, and material density in tons per cubic yard. The tables below cover the conversions suppliers ask about most.

Yards ↔ tons

Loose delivered density, dry basis

MaterialTons / yd³yd³ per ton10 tons ≈
Fill dirt1.15–1.350.808 yd³
Select fill1.20–1.400.777.7 yd³
Topsoil1.00–1.200.909 yd³
Sand1.30–1.500.717.1 yd³
Crushed base1.35–1.550.696.9 yd³

Moisture adds 5–15% to these figures. If you are paying by the ton, ask whether the scale is certified and when the material was last watered.

Dirt Calculator Square Feet: Cubic Yards per 1,000 Sq Ft

Before compaction buffer

DepthCubic yardsCubic feet
1"3.1 yd³83 cu ft
2"6.2 yd³167 cu ft
3"9.3 yd³250 cu ft
4"12.3 yd³333 cu ft
6"18.5 yd³500 cu ft
12"37.0 yd³1,000 cu ft

Multiply by your actual square footage ÷ 1,000, then add the buffer. A 2,500 sq ft lawn at 4 in ≈ 2.5 × 12.3 = 30.8 yd³ before overage.

Acres to cubic yards

Truckloads shown at 14 cu yd per tandem load, rounded up

AcresDepthCubic yardsTandem loads
1 acre6"80758
1 acre12"1,613116
5 acres12"8,067577
5 acres24"16,1331,153
10 acres24"32,2672,305

One acre at a foot of fill is over 100 tandem loads — acreage grading is a supplier-quoted, machine-placed job, not a wheelbarrow project.

Budgeting

Fill Dirt Cost & Delivery Guide

Fill dirt costs roughly $15 to $55 per cubic yard delivered in most US markets, with unscreened bulk fill at the low end ($5–$15 material only) and screened fill at the top. Delivery typically adds $50–$150 per truckload within a 15-mile radius — freight, not material, is usually the biggest line item.

What Drives the Price You Pay

  • Travel distance — dirt is heavy and freight dominates cost. Suppliers within 5 miles often quote a flat trip fee.
  • Screened vs. unscreened — screening removes rocks and roots, and roughly doubles the per-yard price.
  • Season — spring grading season pushes prices up 10–25%; late summer and fall are often cheaper.
  • Quantity — orders under 5 cu yd may carry a short-load fee; orders over 20 cu yd often negotiate down per yard.
  • Region — enter your ZIP above for a regional freight estimate; dense supplier networks in the Northeast and South trend cheaper than Mountain West or Pacific freight. Suppliers usually quote freight one of three ways — flat per truckload, per cubic yard, or per ton — so pick the mode your yard uses; per-yard and per-ton modes price small orders more fairly than a full truck minimum.

How Many Truckloads?

A standard single-axle dump truck holds about 10 cubic yards. Divide your buffered cubic yards by the truck capacity and round up — suppliers don't deliver fractional loads. Example: a 40 × 20 ft backyard at 6 in deep needs 17.0 cu yd with buffer → 17.0 ÷ 10 = 1.7 → 2 truckloads. Tandem (14 yd³) and tri-axle (16 yd³) trucks cut load counts on bigger jobs, and a pickup bed (~2.5 yd³) works for DIY hauling of small orders.

Delivery day

Truck Access, Minimums & Drop-Zone Prep

The order is only half the job — the truck has to reach the drop point and leave without tearing up the yard. Confirm access and fees when you book, not when the driver is already at the curb.

Site access checklist

  • A path at least 12 ft wide with 13–14 ft of overhead clearance for tandem and tri-axle trucks
  • Firm ground — no soft lawns, fresh fill, or saturated soil that a loaded truck will sink into
  • No grades steeper than about 10% on the approach or the dump spot
  • Overhead wires, tree limbs, and gate heights checked before the driver arrives
  • No irrigation heads, septic lids, or unmarked utilities inside the drop zone
  • The drop spot marked with cones, flags, or a person guiding the driver

Hidden delivery charges

  • Minimum haul fee — Trucking companies lose money on tiny loads — 2 yards often carries the same trip fee as 10. Order in bulk where the site allows.
  • Short-load surcharge — Many yards apply a fee below 5 cu yd. Ask what the threshold is before you split an order.
  • Tailgating — Spreading while the truck creeps forward saves hours of shoveling. Ask if the driver can tailgate; not every yard offers it.
  • Wet weight — If you pay by the ton, rain the day before is billed as water. Schedule after a dry stretch and ask about a scale ticket.

Three questions to ask when booking: Is freight a flat trip fee, per cubic yard, or per ton? How far can the driver back in? And what is the policy if the load weighs heavier than quoted?

Drop-zone options

MethodBest whenWatch out for
Single pileThe spread area is close to the drop point and you have a machine or crew to move itA 10 yd³ pile is a serious obstruction — pick a spot you can work around
Tailgate spreadDriveway subbase, long lanes, or a strip you want dumped in a windrowNeeds a clear drive path and a driver willing to creep while spreading
Multiple small pilesSeveral garden beds or zones far apartUsually billed as extra stops or a second delivery
Bagged palletsSmall beds, tight access, or no machine available5–10× the per-yard cost — practical only up to about 1–2 yd³

Moving it

How Much Work Is a Yard of Dirt?

Calculating the volume is the easy part; moving it is where the job gets long. A contractor wheelbarrow holds about 3 cubic feet, so one cubic yard is roughly 9–10 loads — and that number climbs fast with volume.

VolumeWheelbarrow loadsHand laborWhat it really takes
1 cu yd≈ 101–2 hoursShovel, rake, and a tamper
5 cu yd≈ 50A full day, exhaustingRent a mini skid steer or stand-on dumper
10 cu yd≈ 100Multiple days by handSkid steer or compact track loader is the practical minimum
20 cu yd≈ 200Several days with a machineSkid steer plus operator, or a tracked loader with a larger bucket
40+ cu yd400+Not a DIY volumeExcavator or dozer with grading oversight; plan phasing and drainage

Spreading labor

$30–$60 / hr

Typical crew rate for hand spreading, raking, and compacting small to mid-size fills.

Machine rental

$150–$400 / day

Skid steer or mini loader, before delivery, fuel, and operator. Worth it above ~5 cu yd.

Wheelbarrow reality

≈ 3 cu ft per load

A 27 cu ft yard is 9–10 trips — measure the distance before deciding to go manual.

Compaction is not optional on structural fill. Spread in 4–6 inch lifts and compact each lift before the next one goes down. Compacting one thick layer from the top leaves the bottom loose, and that is what settles under a slab or driveway a year later.

Answers

Frequently Asked Questions

Multiply length × width × depth with all measurements in feet, then divide by 27 to get cubic yards. For a 20 × 15 ft area at 6 inches deep: 20 × 15 × 0.5 ÷ 27 = 5.56 cubic yards of base volume. Add a compaction buffer — 15% is the reliable default — and order about 6.4 cubic yards.

When the Formula Is Not Enough

The L × W × D ÷ 27 method covers residential leveling and routine grading. Call a geotechnical engineer before ordering fill for retaining walls over 4 ft, building foundations, loads over ~100 cubic yards, high-plasticity clay subsoils, or any regulated site — many municipalities require an engineered grading plan above 50 cu yd or 4 ft of fill height.