How much space, in which shape
Every decision downstream — material, trucks, cost — is hostage to one number: the cubic yards the project actually needs. These guides cover the chain from tape measure to volume: which formula each shape uses, why depth is the dimension everyone under-measures, and how multi-zone projects should be summed.
The ÷27 rule, and where it comes from
A cubic yard is 27 cubic feet — three feet on a side — so every length × width × depth in feet divides by 27 to land in the unit suppliers quote. The guide derives it, works it at common bed sizes, and shows why measuring depth in inches without converting is the number-one volume error.
Depth: the dimension that decides everything
Doubling the depth doubles the order — and 'a few inches' is where estimates quietly die. The guide sets realistic depths by use case: 2–4 inches for topdressing a lawn, 6–12 for a raised bed, 4–6 compacted for a driveway base, and how to probe an existing grade before guessing.
Circles, rings, and triangles without tears
Round beds use πr² × depth; a ring subtracts the inner circle from the outer; a triangle halves the bounding rectangle. The guide works each formula on a real example — a 10-ft tree ring, a corner bed — so the calculator's shape modes are checkable by hand.
Slopes, wedges, and trapezoid sections
A tapering slope is half its bounding box; a driveway section is (top width + base width) ÷ 2 × depth × length. The guide explains when the wedge assumption holds, when to split a complex slope into zones, and how the road mode matches the way contractors actually measure.